Workflow Guides

How to Write a Commercial Operations Description

ReadyToUnderwrite5 min read

How to Write a Commercial Operations Description

The operations description is the part of a commercial application that says, in plain words, what the business does. The ACORD 125 commercial application asks for a description of operations, and most line-specific sections and carrier supplementals build on it. It is what the account is classified and rated from, so the clearer it is, the fewer follow-up questions the file is likely to bring back.

"General contractor" is not an operations description. It is a category. Two contractors with that label can do completely different work, and the application has no way to tell them apart unless the description does.

What a usable description covers

A description that does its job answers five questions.

1. What does the business actually do?

Name the work, not the industry. "Residential kitchen and bath remodeling, including cabinet installation, tile, and finish carpentry" says far more than "remodeling contractor." For a manufacturer, name the products. For a service business, name the service and who it is delivered to.

2. How does revenue split by type of work?

Most businesses do more than one thing. Give the split as percentages that add to 100:

70% residential remodeling, 25% commercial tenant fit-out, 5% handyman repairs.

The split matters because different kinds of work can fall under different class codes, and the mix affects how the account is classified.

3. What doesn't the business do?

Exclusions are as useful as inclusions. If a contractor never does roofing, never works above three stories, never does new construction, or never handles structural work, say so. State only what is true; the underwriter relies on it, so confirm each exclusion with the client. A short "does not" line answers questions before they are asked.

4. Where does the work happen?

Note the states and the type of site: customer homes, commercial buildings, the insured's own premises, job sites, public roads. If the business works across state lines, list the states.

5. How much is subcontracted, and to whom?

Give the percentage of work subcontracted and what the subs do. Contractor applications and supplementals typically ask about subcontractor use, certificates of insurance, and contract wording.

A simple template

[Business name] provides [core service or product] to [customer type] in [states / area]. Revenue split: [x% type A, y% type B, z% type C]. The business does not [exclusions]. Approximately [n%] of work is subcontracted, mainly [trades]; certificates are collected from subcontractors.

Two to four sentences is usually enough. Length is not the goal; specifics are.

Before and after

Before:

General contractor. Residential and commercial.

After:

Ridgeline Builders performs interior residential remodeling (kitchens, baths, basements) and light commercial tenant fit-out in Oregon and Idaho. Revenue split: 70% residential remodel, 30% commercial fit-out. No roofing, no new construction, no work above three stories. About 20% of work is subcontracted, mainly electrical and plumbing; certificates are collected from all subcontractors.

The second version answers the questions a contractor application typically asks next.

Common gaps to check

  • The description matches the NAICS code and class code on the application.
  • The revenue split adds up to 100% and lines up with total revenue.
  • The website and the description agree. If the website advertises a service the description leaves out, ask the client about it.
  • Exclusions are stated, not implied.
  • Subcontracting is described in percentages, not "sometimes."

Where RTU fits

In ReadyToUnderwrite (RTU), the operations description is a required item on the submission checklist for general liability and businessowners (BOP) policies, and it shows as open until the description is entered or you mark it complete. RTU can pre-fill business details from the prospect's website and the documents you upload. Fields read from documents carry a confidence level, and low-confidence ones are flagged, so you can see what to check against the client's own words. You review and edit everything; nothing is final until you say so.

FAQ

How long should an operations description be? Long enough to answer what the business does, the revenue split, exclusions, locations, and subcontracting. For most small commercial accounts that is two to four sentences.

Should I copy the description from the client's website? Use the website as a starting point, then confirm it with the client. Websites often list services the business rarely performs, or leave out work it does regularly.

Does the operations description affect classification? Yes. Class codes are chosen from what the business does, so the description and the class code should agree.

What if the client's operations change mid-term? Tell the carrier about material changes in operations when they happen, and update the description at renewal. A shift in the revenue split can change how the account is classified.


Related reading: Supplemental applications · Payroll and revenue by class code · Prioritizing missing submission information · How RTU works

Try ReadyToUnderwrite

Free tier — 25 analyses per month, no credit card. Enough to run a couple of weeks of real prospects through the gate before deciding whether the workflow is worth a paid plan.

Start with 25 free analyses

ReadyToUnderwrite — pre-submission intelligence for commercial agents